Combustor overhaul IMG 20250218 WA0009

Combustion inspection

combustor repair

A combustion inspection of a heavy duty gas turbine is a planned shutdown examination focused on the combustion system components. This is typically conducted every 8,000 to 12,000 equivalent operating hours (1 to 2 years), depending on duty cycle, operating environment, and manufacturer guidance.

Combustor overhaul IMG 20250218 WA0009

Our combustion inspection includes:

  • Remove and inspect fuel nozzles, combustor liners, transition pieces, cross-fire tubes, and related components in order to identify issues before they turn into turbine damage
  • Cleaning or replacing parts showing wear, coatings damage, hotspots, cracks, or erosion
  • Leak-test of fuel systems

The MFS combustion inspection ensures that the combustion components of your gas turbine remain healthy and reliable. It helps prevent unscheduled outages, supports performance efficiency, and informs timing for deeper inspections.

Specialized in

Our engineers have experience with both aeroderivative and heavy-duty gas turbines used in industrial and energy applications.

Aeroderivative gas turbines

GE LM series

  • LM1600
  • LM2500
  • LM5000
  • LM6000

Heavy Duty gas turbines

GE Frame series

  • Frame 1
  • Frame 3
  • Frame 5
  • Frame 6
  • Frame 9

Other brands

  • Pratt & Whitney FT4
  • Pratt & Whitney FT8
  • Nuovo Pignone PGT10
  • Nuovo Pignone PGT25

Let us improve your profitability

Reduce turbine downtime and decrease your total cost of ownership.